BELECTRIC Milestones

On the way to a sustainable future

We install more than 1 MWp every working day with own employees and customized equipment. Together with our customers, we have achieved a top performance for a sustainable future with solar energy.

  • 1st grid-connected CIS thin-film system of Europe (2001)
  • 1st thin-film solar power plant of Europe (2002)
  • 1st thin-film solar power plants of Germany, Spain, France
  • 1st thin-film PV roof systems of Belgium, U.A.E. and Spain
  • 1st grid-connected PV system of the U.A.E.
  • 1st solar power plant of the Maldive Islands
  • 1st 900V UL certified solar power plant of the U.S.A.
  • 1st floating-ground solar power plant of the U.S.A.
  • 1st solar power plant with reactive power compensation of the U.S.A.
  • 1st solar power plant operating with 1,500 volts connected to the grid