Press release from Jan 15, 2019

BELECTRIC realizes for innogy large-scale solar power plants in Germany

innogy SE takes over from the developer Primus solar projects with a total capacity of over 50 megawatts peak (MWp) in Thuringia, central Germany, and Bavaria, southern Germany. In total, the pipeline consists of six solar parks that are in different stages of development. An initial project with about 10 MWp of installed capacity is already in an advanced development stage and could take part in an auction this year. BELECTRIC will take on the construction and operation of these projects.