Social Media Post from Apr 18, 2023

In southern Germany, another 13 megawatts have been connected to the grid ☀️

We recently commissioned two solar farms in Bavaria and Baden-Wuerttemberg, Germany. Our plant in #Donaueschingen in Baden-Wuerttemberg has an installed capacity of 7.4 megawatts peak (MWp). The solar power plant near #Hohenbrunn in Bavaria is 5.7 MWp strong. With their more than 24,000 modules, the two solar farms make a small contribution to the energy transition in Germany. 🌱 Project by project, we head into a greener future. 💪